无码一区二区三区,午夜精品国产精品大乳美女,欧美偷窥清纯综合图区,日本在高清av手机

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Accelerating progress mobilization meeting in the flood season held By SDWP international company at DESWSP project in Bangladesh

                                                                                             2019-07-19


On July 8, the Bangladesh DESWSP project of SDWP international company held an accelerating progress mobilization meeting in the flood season. The meeting centered on the analysis and summary of the problems existing in the construction process at the present stage, proposition of solutions, clarification of the importance,management ideas and the emergency work task in flood season to guaranteed the construction progress.

The meeting analyzed and summarized the construction of the project cofferdam, the filling of the construction area and the management of the local labor, and put forward the following requirements for the next stage of the project management: Firstly, it is necessary to strengthen the labor management system, strictly manage the temporary local labor during the emergency period, strengthen communication and coordination among various departments and teams, feedback and communicate problems in time, and solve them in a timely manner. Secondly, it is necessary to improve the importance of safety management in the construction, especially for the site construction personnel who must wear safety hats, safety shoes and other labor protection appliances, for putting up a conspicuous warning sign at the location of the hidden danger; thirdly, each construction group is required not to stop work during the rainy season, overtime to ensure the construction progress of the project.

The meeting stressed that under the current political situation in Bangladesh, it is necessary to strengthen the safety and civilized construction and standardized construction of the project, strengthen the safety measures for projects in flood season, strengthen the monitoring of rain and water conditions, make good emergency plans, and ensure the safety of construction personnel.




Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]
<bdo id="lrd44"><rt id="lrd44"></rt></bdo>
      <bdo id="lrd44"></bdo>
      <menu id="lrd44"></menu>
      <pre id="lrd44"><li id="lrd44"><code id="lrd44"></code></li></pre>

      1. <menu id="lrd44"><dl id="lrd44"></dl></menu>
        主站蜘蛛池模板: 大渡口区| 淮阳县| 拜城县| 教育| 西吉县| 永仁县| 河津市| 甘孜县| 成武县| 屏东市| 新巴尔虎左旗| 白城市| 色达县| 类乌齐县| 沭阳县| 大余县| 湛江市| 中牟县| 木兰县| 华阴市| 榆中县| 报价| 随州市| 宣化县| 淄博市| 道真| 荥阳市| 昂仁县| 长子县| 麻城市| 柳江县| 满洲里市| 甘洛县| 长春市| 顺昌县| 烟台市| 彰化县| 汉阴县| 永定县| 名山县| 长岛县|